Specifications include, but are not limited to: JVWCD desires to replace an existing cast iron pipeline located along 3300 South from State Street to 1100 West with a proposed 12” diameter pipeline. Currently, a section of this pipeline has been isolated due to multiple pipeline breaks. The new pipeline will provide redundant capacity for JVWCD’s retail distribution system located west of the I-15 corridor. A schematic of the existing distribution system located along 3300 South is included (Appendix A). The existing cast iron pipeline was installed in 1956 and is located within the public right-of-way along 3300 South. The new pipeline will start at State Street with a connection to an existing 8” cast iron pipe and end at approximately 1100 West 3300 South with the retail service connection for the James Madison Park. JVWCD assumes that the new 12” pipeline can be installed within the 3300 South public right-of-way.