Specifications include, but are not limited to: The Salt Lake City Department of Public Utilities (SLCDPU) is soliciting Statements of Qualifications (SOQ’s) from qualified consulting teams or firms with the experience and expertise to provide preliminary design, final design, permitting support and construction phase services for the 1200 West Trunk Line Rehabilitation project. This project will rehabilitate the 1200 West Trunk Line. The 1200 West Trunk Line includes 115 segments of reinforced concrete pipe (RCP) totaling approximately 37,200 linear feet of 36-inch to 78-inch diameter pipe. The 1200 West Trunk Line extends from the pump station at the north end of 1200 West (MH 28022) to MH 20178 along West Temple at the intersection with 2100 South, and to MH 02207 along 1300 South at the intersection with State Street as shown in Attachment A.