Unified Fire Service Area ("UFSA") is soliciting competitive sealed proposals from qualified offerors for the renovation and upgrade of the kitchen and flooring at Unified Fire Authority, Station 118. Given the 24-hour operation of the station, the project must be completed with minimal disruption to daily activities. The contractor must adhere to a tight schedule, minimizing construction mess, and ensuring that the kitchen downtime is kept to an absolute minimum. The overall contract will be assessed, in part, based on the contractor's ability to meet these timing and disruption expectations Specifications: 1. Appliances (Contractor-Provided and Installed): • 3 Quality Residential-Grade French Door Refrigerators: These will be contractorsupplied and installed. Minimum of 25cu. Ft. The refrigerators must be of high-quality residential grade, Samsung or GE, without ice and water dispensers, and ownerapproved. Stainless steel in color • 1 KitchenAid or Thermador 48" Gas Cooktop (Model # KCGC558JSS or equivalent): Supplied and installed by the contractor. If an equivalent model is chosen, it must meet or exceed the specifications of the listed model and be approved by the owner. • 2-30" Oven's (Model #JTS5000SN2SS): Supplied and installed by the contractor. Or an equivalent and approved by the owner. o 1 Dishwasher (Model # FDSH4501AS): Supplied and installed by the contractor. Or 이 an equivalent and approved by the owner. Stainless steel. Stove top Hood Refurbishment: Hood to be refurbished, cleaned, and lighting upgraded to improve efficiency. • Microwave: The contractor is to supply and install a large stainless steel countertop microwave, with the specific model to be determined. 이 이 Coffee Maker: The contractor is to supply and ensure space for the BUNN 33200.0015 VPR-2GD 12-Cup Pourover Commercial Coffee Brewer with upper and lower warmers and two glass decanters. The coffee maker should be installed and connected according to specifications. Water Cooler/Ice Maker Build-In: Supplied and Installed by the contractor. A designated area will be built for the water cooler/ice maker unit, including provisions for drainage to ensure proper function. All appliances can be substituted with models of like or better quality, subject to owner approval. The contractor is required to provide all necessary electrical and plumbing work to support the installation and functioning of all appliances and fixtures. This includes connecting power, water, and drain lines where necessary.