Construction of a 10- foot-wide asphalt trail with 1-foot shoulders, concrete pedestrian ramps, and storm drain and irrigation improvements. The project is located within UDOT right-of-way on the west side of SR-32, extending from 530 South in Kamas, Utah to the intersection of SR-35 in Francis, Utah, known as SR-32 TRAIL CONSTRUCTION, PHASE III. The scope includes, but is not limited to providing all materials and labor to install 17,200 linear feet of 10-foot-wide asphalt trail, constructing 1,000 square feet of concrete sidewalk, storm drain and irrigation upgrades, potholing and locating existing utilities, saw-cutting, removing and properly disposing of existing asphalt, installation of new trail, and restoring and revegetation of surfaces impacted by construction activities.