Specifications include, but are not limited to: 1.Assure the project requirements are met; assure the best value for the project is met; assure the project budget is not exceeded; expedite the project to completion. 2.Prepare and submit detailed working drawings of the artwork to the County project team for approval. 3.Prepare and submit proposed timeline for Artist’s services including fabrication, transportation, and installation of artwork. 4.Prepare artwork in accordance with approved design. 5.Provide approved engineering drawings for the artwork if required. 6.Transport artwork to site. 7.Install artwork at site. 8.Remove the installation from site within the required timeframe. 9.Site Safety: Each of the selected Artists and their staff will be required to conform to OSHA safety requirements. The Artist(s) will be solely responsible for all aspects of job site safety relevant to their work. 10.Provide maintenance instructions as necessary and information regarding the artwork and its creation. 11.Provide proof of insurance.