Specifications include, but are not limited to: Use Specifications, Photos and Electrical Plans to retrofit lighting in the arena. Will be upgrading from fluorescents to LED’s. College will provide staging for the duration of the job. EXISTING ARENA LIGHTING: Fixtures x Tubes Per Fixture = Total Tubes Main Arena 68 12 816 High Bleacher (A) 12 6 72 High Bleacher (B) 24 4 96 104 22 984 III. Installation Replace all lamps Retrofit existing T5 fluorescent to LED tube/strip/high bay. True color capability (color changing lights). Temperature tunable capability. Programmable with sound system. Programmable for time of day change (scheduling capabilities). Alternate 1: Replace all 104 fixtures: Furnish fixture engineering data and quantity with bid. IF awarded, submit shop drawings for approval. Shop drawings shall include stamped engineering design and specifications. IV. Mandatory Requirements All work and systems must conform with IECC 2018 and NEC 2017. Proposed LED lamps/strips/high bay must have a 50% reduction of wattage. Proposed LED lamps must be ≤ 27W per replaced lamp. Delamp, shall be approved, pending approval of lighting level calculations provided by licensed engineer. All lighting must be dimmable.