Specifications include, but are not limited to: A 2 year contract for Refinishing the court in the Wayne Estes Center. Annual floor maintenance – Alternating years – 2 phases (Basecoat w/build-up/Recon or similar touch-up). First year needs additional paint. Phase one – year one – Screen and Recoat entire gymnasium floor, except underneath the permanent bleacher areas when fully retracted, with two (2) coats of Hillyard Basecoat and one (1) top coat of Hillyard 1907 finish coat, or quality equivalent or better. Touchup game lines as they now exist. Phase two – year two – Scrub, deep clean and coat with two (2) coats of Hillyard Recon, or quality equivalent or better. Paint – Add new volleyball court lines to better utilize 2 courts. Lines will be outside the main volleyball court, and light enough that it doesn’t clash with existing court lines. See attached photo’s for rough guideline.