The scope of this project will be to provide all the labor, materials, tools and equipment necessary to add two pumps to the existing pump cans located in Pump Station 3, add two additional mainline drains to the existing Traverse Transmission Line (TTL), replace the existing surge tank compressor and associated appurtenances, perform lighting and electrical improvements to the existing pump station, as well as rehabilitate cathodic protection facilities along the TTL, as described in the project plans and specifications. Portions of Work will take place under critical shutdown schedules as outlined in these documents. Coordination will be required with the City to manage water supply to residents on Traverse Mountain during these shutdown periods. There will be a limited and fixed volume of water available in the City’s storage reservoirs to maintain water supply to these residents during these periods as required for shutting down and tying in the new facilities to the existing Traverse Line.