The Project, in general, includes clearing (tree removal) & grubbing the wooded 2 acre settlement basin site, excavation and mass grading of settlement basin pad (7,500 CY net import); road work (1,000 linear feet (LF) of new 12-16 foot wide gravel roads and reconstruction of 2,100 LF of asphalt road through Timpanogos Park), construction of a cast-in-place connection and drain vault, a 510' x 120' x 6' settlement and dewatering basin, and miscellaneous concrete pads/retaining walls; installation of approximately 700 feet of 24-inch diameter HDPE sluicing pipe down a steep grade (11-64% grade); installation of 80 feet of 4-inch diameter HDPE pump suction pipe; installation of 4,400 linear feet of 6-foot chain-link security fencing; and mechanical work including weir gates, plug and butterfly valves, combination air valves; electrical work including RTU/control panel, multiple FO patch panels, FO and power conduits including conductors, site lighting and security, interconnection to existing control & power panels