Installation of approximately 2,100 feet of 48” welded steel pipe, construction of two maintenance access vaults, and a connection to the existing pipe header at the Sam Park Inlet Valve Vault on the Terminal Reservoir site. Work also includes relocation of 675 feet of 8” ductile iron water pipeline with 17 water services and 1 fire hydrant, and also relocation of 175 feet of 8” PVC sewer line and 2 manholes with reconnections of 2 sewer laterals. Work also includes installing new cathodic protection test stations. All work includes traffic control work and restoration of all roadways, curb and gutter, waterways, park strips, private properties and any areas disturbed during construction activities. Work also includes demolition of the house at 3127 South 3380 East.