The work to be performed consists of furnishing all labor, tools, materials, equipment, transportation, and services required for the construction of the above described project as included in the Contract Documents; consisting of the following items of work: approximately 1,855 LF of new 8” culinary water line and new residential services including meter boxes and setters for existing homes; installation of 2 culinary PRV’s (provided by City), and 2050 LF of new storm drain pipe, excavation of 7,100 SY of existing road, installation of new asphalt, replacement of monuments, and installation of new collars for all water valves and manholes; all in accordance with the Drawings and Specifications prepared by the North Salt Lake City Engineering Department