Specifications include, but are not limited to: 1. Approximately 33,800 SF of patching at six (6) of the nine (9) locations. Must be cut, removed, compacted and re-asphalted in the following areas: NSSD bus garage, Spring City Elementary, North Sanpete High School, North Sanpete Middle School, Fairview Elementary and Pleasant Creek School. 2. North Sanpete School District requires 4” thickness asphalt in the following areas: North Sanpete Middle School Bus Lane / Student drop off, North Sanpete School District Bus Garage and Fairview Elementary Bus Lane. (These 4 areas total approximately 10,400 SF of the approximate 33,800 overall square footage). 3. Crack sealant specifications require Maxwell Elasto-Flex 65, DEERY 103UT (Or equivalent) to be used for all crack sealing. Must include all cracks and areas between concrete and asphalt. All cracks 1/8” or larger must be cleaned with a minimum 100psi air and all vegetation must be removed. A primer coat of GSB 78 (min of .08 gals per square yard) followed by two coats of GSB seal-coat with a max 20% delusion. All seal coating on edges must be hand applied. Striping of all parking lots and playground to match existing paint. 4. Striping – Each location/lot shall be re-striped to existing layout.