Specifications include, but are not limited to: The work generally includes, but is not limited to: sidewalk removal and disposal, pedestrian ramp removal and disposal, curb and gutter removal and disposal, preserving in place the asphalt (if asphalt is damaged it will be part of the curb and gutter line item and the responsibility of the contractor to repair per city specifications), protecting existing precast wall (if precast wall is damaged by contractor it must be repaired by the contractor), installing new curb, gutter, sidewalk, and pedestrian ramps per APWA and city standards, traffic control and application per MUTCD standards and requirements, and any other materials, transport, and labor necessary to complete job based on construction plans and City Standards and Specifications.