The work along Green Way includes the installation of approximately 930 feet of 24” diameter RCP, 230 feet of 19”x30” Elliptical RCP, 290 feet of 18” diameter RCP, and 50 feet of 15” diameter RCP; installation of junction boxes and inlet boxes; coordination with third party utilities for their relocation; removal and disposal of existing storm drain infrastructure; removal of existing waterways, regrading, and new asphalt installation. The work along Bryce Drive includes the installation of approximately 175 feet of 29”x45” Elliptical RCP (primarily along the north property line of house 8196 S Bryce Drive); 30 feet of 24” RCP; installation of new junction boxes, double inlet boxes, and double combination box; outfall into an existing canal; coordination with third party utilities for their relocation; relocation of an existing water service line and meter; roadway, landscape, and driveway restoration. The work near 700 East and Skylark Lane includes modification of approximately 230’ of existing East Jordan Canal flume wall. These modifications include raising the west wall of the flume by 18”; removal and reinstallation of existing chain-link fence; modifications of two existing outfalls; and overall landscape restoration and flume cleaning.