1. Excavation, grading, and backfilling. 2. Construction per APWA #205.1, Type A. 3. Furnish, place and compact 8” untreated base course. 4. Excavation, grading, and backfilling. 5. Tie lip of gutter to edge of existing asphalt. 6. Any asphalt damaged by contractor shall be replaced with a minimum 2’ wide x 4’ long strip of 6” asphalt / 8” untreated base course (minimum, match existing) per City standard specifications. Necessary asphalt patches must be at least 5 feet apart. 7. Excavate, form, place, finish, and install joints, groove, and cure concrete. 8. Protect, repair, adjust to grade, relocate or replace any existing sprinkler system components (pipe, heads, valves, valve boxes, etc.) . Match materials and brands and ensure coverage of landscaped areas. 9. Restore, and ensure vegetation establishment of any damaged or disturbed landscaping to pre-existing conditions. 10. Preparation of submittals 11. Show concrete achieves 28-day strength specifications. 12. Preparation and approval of submittals. 13. All testing and documentation necessary for compliance with APWA quality control specifications.