Specifications include, but are not limited to: 1 ITEM NO. 1 – MOBILIZATION This item shall consist of the preparatory work and operations in mobilizing for beginning work on the project, including, but not limited to those operations necessary for the movement of personnel, equipment, supplies, and incidentals to the Project Site, safety equipment and first aid supplies, sanitary and other facilities as required to safely conduct the scope of services and in accordance with local laws and regulations. The costs of bond and any required insurance and other pre-construction expenses necessary for the start of the work, excluding the cost of construction materials, shall also be included in this Section.; 2 ITEM NO. 2 – DEMOLITION OF BLDG A Measurement for payment will be by the lump basis. This item shall include demolition of bldg. A and supporting slab, and legal disposal of all demolition debris. Contractor shall also make provisions to provide water for dampening excess flyable dust.; 3 ITEM NO. 3 – DEMOLITION OF BLDG B Measurement for payment will be by the lump basis. This item shall include demolition of bldg B and supporting slab, and legal disposal of all demolition debris. Contractor shall make provisions to cordon off the work site with caution tape to warn and prevent the general public from entering the work site. Contractor shall also make provisions to provide water for dampening excess flyable dust.; 4 ITEM NO. 4 – DEMOLITION OF BLDG. C Measurement for payment will be by the lump basis. This item shall include demolition of bldg. C and supporting slab, and legal disposal of all demolition debris. Contractor shall make provisions to cordon off the work site with caution tape to warn and prevent the general public from entering the work site. Contractor shall also make provisions to provide water for dampening excess flyable dust.; 5 ITEM NO. 5– DEMOLITION OF BLDG. D Measurement for payment will be by the lump basis. This item shall include demolition of bldg. D and supporting slab, and legal disposal of all demolition debris. Contractor shall make provisions to cordon off the work site with caution tape to warn and prevent the general public from entering the work site. Contractor shall also make provisions to provide water for dampening excess flyable dust.