Specifications include, but are not limited to: The Virgin Islands Port Authority (the “Authority” or “VIPA”) is seeking bids from qualified and experienced licensed contractors for the rehabilitation of Apron 5,7 and 2 at the Henry E. Rohlsen Airport. The base bid project consists of the concrete demolition of existing 15” - 23” thick apron pavement and the replacement with 15” Concrete pavement and 7” – 9” Cement Treated Base, demolition the existing RCP Drainage pipe network, inlets and manholes, and installation of a new drainage network consisting of Class V reinforced concrete pipe and aircraft rated inlets. Additive Bids include expansion of the concrete apron replacement area, the full depth removal of the existing asphalt apron push back apron behind Terminal Gates 7 thru 10, and the replacement of the push back apron with 15” Concrete Pavement and 9” Cement Treated Base.