Specifications include, but are not limited to: A. Provide complete existing conditions analysis, Topographic Survey, Land/Parcel Survey and establish the public Right-Of-Way. All surveys, Right of Way, and final design plans are established using the NAD83 Datum. Two permanent control points shall be established.; B. Locate all existing utilities to quality level A utilizing ASCE SUE techniques including but not limited to GPR and daylighting as required. Existing utilities include water, electricity, sewer, and communication.; C. Perform a geotechnical investigation as required to design the preferred improvements.; D. Identify required permits, prepare applications, and follow through to the issuance of permits. Required permits may include building, earth change, floodplain, CZM, and SWPPP. Provide support to DPW during the permitting process including preparation of reports, presentations, and attending meetings and hearings.; E. Coordinate with all local utility agencies and prepare draft utility agreements.; F. Coordinate with existing and proposed projects within the study area including improvements to Department of Education, Sports Parks & Recreation, and Housing Authority facilities.; G. Develop Right-Of-Way plans to establish proposed new Right of Way.; H. Prepare Cadastral Plans for all required acquisitions.; I. Provide Finalized Project scope of work description and detailed schedule including dates with project milestones.; J. Finalize design and prepare final PS&E package, including all bid documents for submittal to DPW.; K. A/E firm shall provide 10 sets of final plans and specifications to DPW upon final review and approval by DPW.; L. A/E firm also shall submit final Plans, Specifications and Engineers Estimate on electronic file. (AutoCAD and PDF format)