Specifications include, but are not limited to: The scope of work for the renovations in Phase 1 of the proposed project is the repair to lighting fixtures, concrete picnic benches, columns and chains along the warfront promenade. New handrails will be installed to the existing elevated concrete surfaces and the damaged concrete steps and retaining walls will be repaired and patched. The existing sidewalk will be demolished and replaced. See the attached Bid Schedule and photographs for more scope of work details.; The proposed project has a minimal potential of impacting environmental resources, or ambient water quality during construction. As necessary, sedimentation and erosion control measures must be implemented during construction to ensure that no environmental impacts occur. The proposed project occurs only within previously disturbed areas and excavation of historical or cultural resources is not anticipated. Project activities must stop if historic remains or resources are encountered, and SHPO must be contacted to determine the best course of action.; PAINTING: A. This Section includes surface preparation and field painting of the following:; B. Exposed interior items and surfaces.; C. Surface preparation, priming, and finish coats specified in this Section are in addition to shop priming and surface treatment specified in other Sections.; D. Paint exposed surfaces, except where the paint schedules indicate that a surface or material is not to be painted or is to remain natural. If the paint schedules do not specifically mention an item or a surface, paint the item or surface the same as similar adjacent materials or surfaces whether or not schedules indicate colors. If the schedules do not indicate color or finish, the Owner’s Representative will select from standard colors and finishes available.; E. Painting includes field painting of exposed bare and covered pipes and ducts (including color coding), hangers, exposed steel and iron work, and primed metal surfaces of mechanical and electrical equipment.; INTERIOR LIGHTING: A. Metal Parts: Free from burrs, sharp comers, and edges.; B. Sheet Metal Components: Steel, except as indicated. Form and support to prevent warping and sagging.; C. Doors, Frames, and Other Internal Access: Smooth operating, free from light leakage under operating conditions, and arranged to permit re-lamping without use of tools. Arrange doors, frames, lenses, diffusers, and other pieces to prevent accidental falling during re-lamping and when secured in operating position.; D. Reflecting Surfaces: Minimum reflectance as follows, except as otherwise indicated: 1. White Surfaces: 85 percent; 2. Specular Surfaces: 83 percent; 3. Diffusing Specular Surfaces: 75 percent; E. Lens glasses, Diffusers, Covers, and Globes: 100 percent virgin acrylic plastic or water white, annealed crystal s, except as otherwise indicated. 1. Lens Thickness: 0.125-inch (3 mm) minimum; except where greater thickness is indicated.; 2. Plastic: High resistance to yellowing and other changes due to aging, exposure to heat, and UV radiation.