Specifications include, but are not limited to: DPNR St. John Office Rehabilitation on behalf of the Department of Planning and Natural Resources. Mobilization and General Conditions: FEMA and Renovation - General Requirements (Division 1). FEMA - [4L] [Building Interior]: Remove and Replace Electrical Load Center and Associated Distribution System, including switches, outlets, and conduits. Existing QTY: Single Switch (7), Double Switches (4), Triple Switches (1), Duplex Outlets (23), and Weatherproof Outlet (1). FEMA - [4M] [Building Interior]: Remove and Replace Five (5) Ceiling Fan w/ Light for Office Pendant Light Fixtures Designed for Vaulted Ceiling. Proposed Lightolier Light Fixture or Equivalent. (See Sheet E1.1 Lighting Plan on Architectural Drawings.) 5 Ea. FEMA - [4N] [Building Interior]: Remove and Replace Five (5) Fluorescent Light Fixture for Office Pendant Light Fixtures Designed for Vaulted Ceiling. Proposed Lightolier Light Fixture or Equivalent. (See Sheet E1.1 Lighting Plan on Architectural Drawings.) 5 Ea. FEMA - [4O] [Building Interior]: Remove and Replace: Smoke Detectors. Hardwired. 5 Ea. Replace all Exit Signs with Hard Wired Lighted Signs and Battery Backup 2 E.A. FEMA - [46] [Building Exterior]: Prep and Paint: Painted Stucco Wall Finish, Powerwashing, Scrapping & Exterior wall and Priming and Painting Exterior Wall. Front wall 48 FT X 10 FT; side wall 34 FT X 10 FT; side wall 34 FT X 18 FT; rear (2 story) wall 48 FT X 23 FT. 2546 S.F. FEMA - [Building Exterior]: Remove Door; 96 IN X 80 IN door and fixed impact glass unit. Install New 96 IN X 80 IN Door and Fixed Impact Glass Unit; Door is 36 IN X 80 IN. 1 Ea. FEMA - [Building Exterior]: Remove Damaged Glass Windows and Replace With Impact Resistant Window: 52 IN X 50 IN high, 1 EA. and 52 IN X 50 IN, 1 EA. 1 Ea;