1 Mobilization L.S. 1 2 Contractor Testing L.S. 1 3 Silt Fence Erosion Control L.F. 110 4 Excavation C.Y. 175 5 Crushed Stone Base Installation C.Y. 27 6 Polyethylene Vapor Barrier S.F. 2,200 7 Reinforced Concrete Footings, Slab, Walls & Roof C.Y. 200 8 Metal Guttering w/ 2x8 Gutter Attachement L.F. 82 9 Install All Plumbing Lines, Leads, Pipes, Sleeves and Valves L.S. 1 10 Install Pump, Pressure Tank & Water Heater L.S. 1 11 Install Electrical Service, Outlets, Switches and Light Fixture L.S. 1 12 Splash Blocks Ea. 5 13 Cistern Hatch Covers Ea. 5 14 Elastomeric Roof Coating - Roof Slab S.F. 1,981 15 Concrete Waterproofing - Cistern Interior S.F. 7,540 16 Portland Cement Plaster Finish S.F. 2,376 17 Exterior Acrylic Latex Painting - Exterior Walls S.F. 2,376 18 3'0" x 6'-8" Metal Framed Vented Pump Room Door Ea. 1