Specifications include, but are not limited to:. Demolish and remove steel water tank and existing concrete foundation (steel sedimentation basin). Remove and cap/seal existing yard piping for steel water tank (steel sedimentation basin). Furnish and install 24” ductile iron yard piping, fittings, valving and appurtenances for sludge line. Furnish and install 24” flap valve discharge on reservoir 2. Remove galvanized steel fencing. Re-grade city reservoir #2 to consistent elevation. Reinstall and repair galvanized steel fencing . Demolish and remove sub-grade concrete floor and walls . Demolish existing yard piping below concrete sedimentation basins . Furnish and install 24” cut-in Tee (Thompson pipe group) . Demolish and remove existing brick/concrete storage building