Specifications include, but are not limited to: The staging area(s) for the Project shall be assigned by the Airport Environmental Affairs Department (EAD) if shown on the Plans. B. The staging area on the Airport shall not be used for the storage of chemicals, materials, and equipment related to any Contractor’s off-site work. C. The Contractor shall submit an Erosion Control Plan (ECP) and a Storm Water Pollution Prevention Plan (SWPPP) to the Owner’s Authorized Representative (OAR) if the staging area(s) is/are not already included in the Plans ECP or SWPPP. D. The Contractor shall comply with the EAD Administrative Policy Staging Yard Authorization and Utilization procedures, the International Building Code 2009 (IBC), and the International Fire Code 2009 (IFC) and Local Amendments.