Specifications include, but are not limited to: • Install six (6) new 345kV, 10,000pF CCVT’s with structures, grounding, and associated foundations on the 345kV North Bus. The CCVT secondary will not be utilized. • Install six (6) new 345kV, 10,000pF CCVT’s with structures, grounding, and associated foundations on the 345kV North Bus. The CCVT secondary will not be utilized. • Replacement of three (3) existing 345kV, 2,650pF CCVT’s on the Jack Creek line position with new 10,000pF rated CCVT’s. The existing structures will be utilized and steel adapters will be installed to achieve required ground clearance. Secondary cables to the junction box will be replaced and the CCVT carrier lead-in cable to the line tuning unit will be replaced. New jumpers and ground risers will be required.