Specifications include, but are not limited to: A. Work under this scope of work covers the demo of an existing roof and the installation of a new two-ply modified Bitumen roofing system. In addition, Contractor must include all related items of work as noted herein and on the construction document drawings and roof specifications or otherwise required to complete the specified elements of work and provide the necessary warranties for the work. B. Contractor will remove the existing roof down to the roof deck including all existing composition base flashing. Contractor will dispose of all materials properly. C. Contractor will provide new metal coping. Color to match existing metal coping. Submit samples to DPS for approval. D. Contractor will protect elements that are not a part of the scope of work: roof that is labeled not a part of the scope of work, scuppers, HVAC units, pipes, and drainage system during construction at all time. E. Location and details of thru scuppers to remain. F. Contractor must schedule core sample prior to day of site visit and before bid submission. Contractor is to ensure that all holes are properly sealed and to provide full report of finding to DPS along with bid.