Loading...
Skip to main content
< Back to results

Roberto R Bustamante WWTP Aeration Basin Inlet Channel Improvements Re-Bid


Location
Texas
Publication Date
07/11/2019 09:53 AM EDT
Closing Date
08/14/2019 04:00 PM EDT
Issuing Organization
El Paso Water Utilities
Solicitation Number
Description

Specifications include, but are not limited to: Contractor shall install Owner provided equipment including two (2) installation frames, two (2) pneumatically sealed bulkheads, six (6) permanent bulkhead frames and twenty-four (24) sluice gates. The 316L stainless steel sluice gates include four (4) 12-inch sluice gates with manual actuators, four (4) 24-inch sluice gates with electric actuators and sixteen (16) 15-inch sluice gates with manual operators. The project will require modifications to the existing concrete walkway over the aeration inlet channel in five (5) places. Contractor shall furnish and install new aluminum grating over the new opening in the concrete and span across the existing opening. All existing gates shall be removed and salvaged to Owner. Contractor shall be responsible for furnishing and installing all stainless-steel anchors and mounting hardware needed for the project. Contractor shall be responsible for connecting new electric operators to existing power and control connections.

Get instant access

Get instant access to solicitation details & future business opportunities.

to solicitation details & future business opportunities.

Get Access

Vendor packages with access to similar open solicitations

Matching bid notifications & access to all Statewide & Group bid details

Statewide

Matching bid notifications & access to all Statewide & Group bid details

Matching bid notifications from participating agencies

Group

Matching bid notifications from participating agencies

Access participating agency bids

Basic

Access participating agency bids