Specifications include, but are not limited to: Complete installation of nine new split systems and three new package units. • First year parts and labor guarantee. • Provide all necessary labor, equipment, materials and incidentals for a turnkey project. • See attached equipment submittal package. • Include new heat kit. Verify the existing heat kit information and match existing KW rating. • Contractor to dispose of old equipment. • Provide new disconnects and whips to each piece of equipment. • Reconnect all controls, piping, duct, and electrical. • Insulate any disturbed duct or piping to match existing. • Provide schedule including lead-time and installation time. • Work will be during normal business hours for the exception of building (B) work will be Friday – Sunday. • Provide spot coolers as needed during change out. • Coordinate all work with Harris County Project Manager. • Add hail guards. • Add new secondary drain pan. • Add condensate over flow cut off at secondary drain pan. • Reuse existing drain lines. • Automated Logics control existing systems. Reconnect controls. • Contractor to remove and put back all the ceiling as needed to replace equipment