Specifications include, but are not limited to: • Dallas Museum of Art, 1717 N. Harwood Street - Constructed in 1984 and located in the Arts District of downtown Dallas. This facility is now in need of the following repairs: o Renovate, upgrade, and modernize 11 elevators, which includes eight passenger elevators (three in the parking garage and five in the museum) and three freight-sized elevators o Water infiltration and exterior drainage in the Fleischner Courtyard and entire Building Perimeter o Renovate, repair and upgrade six public restrooms on the first floor to be ADA compliant and create three family restrooms o Replace all exterior doors with weather-tight doors and code compliant security hardware o Upgrade existing security system with fiber optic backbone, replace analog cameras with IP technology, upgrade video storage and alarm server o Replace existing fire alarm system and related components in the entire building • Meyerson Symphony Center, 2301 Flora Street - Constructed in 1989 and located in the Arts District of downtown Dallas. This facility is now in need of the following repairs: o Evaluate the roof condition for repairs or replacement o Repair water damaged ceilings in the Lobby o Renovate, upgrade, and modernize two passenger elevators o Resolve water infiltration at the curtainwall o Upgrade the lighting controls o Replace existing fire alarm system and related components in the entire building o Replace the reverberation door controller system