Specifications include, but are not limited to: 1. Project Description: Remove the Cleaver Brooks CFC-700-1500-125HW existing boiler and replace with a Like Unit with documentation boiler system. It is stipulated all existing equipment (pumps etc.) will be used in conjunction with the new boiler. See paragraph A.5 below for specific product information. 2. The Contractor shall include all materials, quantities, devices, equipment and labor to provide a working system, complete in all respects integrated into the building and connected to the Facility’s campus where required by project scope. 3. The Contractor shall be responsible for any repair of damaged surfaces that may be damaged as a result of the installation of this system, equipment or devices. This repair shall match the existing surrounding surfaces and provide a seamless transition. 4. Products (Basis of Design): a. For Building 678 that serves Bldg. 509: i. Provide and install a boiler utilizing the following preferred manufacturer and model: 1. Cleaver Brooks CF-CE 700-1500-125HW Boiler (or Equal); 2. Include the following options: a. start/stop; b. Temp in/out, and c. Run indicator b. Submit on the design and equipment with detailed calculations, plans and shop drawings, catalogue cuts marked in detail, and equipment lists. These items must be approved prior to ordering material and equipment and mobilization. c. Final testing and start up shall be performed in the presence of the Plant Maintenance Manager or their designee.