Specifications include, but are not limited to: f approximately 440 linear feet of 8x4 and 7x4 Box Culverts, 120 linear feet of 36”, 150 linear feet or 30” and 245 linear feet of 24” Class III Reinforced Concrete Pipes with associated bends, installed and complete in place across Greek Row on the UTA campus. This project also requires the construction of 4- 10 foot curb inlets and appropriate headwalls and end treatments for above listed pipes. Relocation of approximately 100 linear feet of 6” water line is required, as well as steel sleeve installation for all utility crossings (water and sanitary sewer) under proposed storm drain lines. All pipes will be properly installed with appropriate compaction and pavement repair.