Specifications include, but are not limited to: 1 Mobilization and Demobilization, as per Specification 01 71 30 LS 1 2 Control of Ground Water and Surface Water. Furnish, install, and operate dewatering throughout the project as needed. Dispose of removed water. Complete in place. Specification 02 02 25. LS 1 3 Furnish a Storm Water Pollution Prevention Plan (SW3P), Engineered, Signed and Sealed LS 1 4 Storm Water Pollution Prevention System, In accordance with the approved SW3P Plan, Complete in place LS 1 5 Furnish a Trench Excavation and Shoring Safety Plan, Engineered, Signed and Sealed. LS 1 6 Trench Excavation and Shoring Safety System, In accordance with the approved Plan, Complete in place. LS 1 7 Pipe Removal and Disposal. Remove and Dispose of Existing 36 Inch Diameter RCP Pipe with Fittings and Thrust blocking. Specification 01 57 60. Specification 02 00 94. LF 56 8 IPS 42 Inch HDPE Pipe, PE 4710, AWWA C906, DR 17 Minimum 125 PSI. Installed as per the engineering drawings Sheet M-02 and Sheet SD-02, and ASTM D2487, ASTM D2774, and AWWA M55. Complete in place. Specification 33 05 33. LF 56