Specifications include, but are not limited to: Remove existing bathroom partitions, FRP, sheetrock, lighting, suspended ceiling, toilets, urinal, sinks, doors, air vents, water heater and floor covering. 2. Remove fiber board and lath from ceiling in Mechanical Room. 3. Run modular furniture electrical power supply in ¾” EMT conduit and terminate in metal single gang outlet box with single gang BNC stainless wall plate. 4. Run network wiring in ¾” EMT conduit and ruminate in metal single gang outlet box. 5. Insulate exterior walls and interior office walls. 6. Install new sheetrock throughout building. Tape, float, texture, primer (1 coat) and paint (2 coats Navaho White). 7. Install new 2’x2’ suspended ceiling grid and tile throughout building