Specifications include, but are not limited to: Marshall Ave. is 2606’/0.49 mile. From 10th Street (south) to Gulfway Drive (north), the Contractor will mix and reclaim the 5 inches of the base with the existing asphalt. Roll down the base with a steel wheel roller to achieve compaction. Grade the base to provide a minimum of 2% crown along the center of the road. Asphalts, oils, and emulsions shall meet all requirements per TxDOT “Standard Specification for Construction” Item 300. Prime Coat will be 0.20 Gal/SY and let heal for 24 hours. Resurface the road with 2 inches of Hot Mix Asphalt Concrete Type D. - 6th Street is 3400’/0.64 mile. From Brazos Ave. (west) to Duff Dr. (east), the Contractor will mix and reclaim the 5 inches of the base with the existing asphalt. Roll down the base with a steel wheel roller to achieve compaction. Grade the base to provide a minimum of 2% crown along the center of the road. Asphalts, oils, and emulsions shall meet all requirements per TxDOT “Standard Specification for Construction” Item 300. Prime Coat will be 0.20 Gal/SY and let heal for 24 hours. Resurface the road with 2 inches of Hot Mix Asphalt Concrete Type D. 42nd Street is 930’/0.18 mile. From 9th Ave. (west) to Wentworth (east), the Contractor will mix and reclaim the 5 inches of the base with the existing asphalt. Roll down the base with a steel wheel roller to achieve compaction. Grade the base to provide a minimum of 2% crown along the center of the road. Asphalts, oils, and emulsions shall meet all requirements per TxDOT “Standard Specification for Construction” Item 300. Prime Coat will be 0.20 Gal/SY and let heal for 24 hours. Resurface the road with 2 inches of Hot Mix Asphalt Concrete Type D. - 3rd Ave. is 1289’/0.24 mile. From 32nd Street (south) to 36th Street, the Contractor will mix and reclaim the 4 inches of the base with the existing asphalt. Roll down the base with a steel wheel roller to achieve compaction. Grade the base to provide a minimum of 2% crown along the center of the road. Asphalts, oils, and emulsions shall meet all requirements per TxDOT “Standard Specification for Construction” Item 300. Prime Coat will be 0.20 Gal/SY and let heal for 24 hours. Resurface the road with 2 inches of Hot Mix Asphalt Concrete Type D. 64th Street is 3401’/0.64 mile. From Garnett (west) to W. Port Arthur Rd. (east), the Contractor will mix and reclaim the 6 inches of the base with the existing asphalt. Roll down the base with a steel wheel roller to achieve compaction. Grade the base to provide a minimum of 2% crown along the center of the road. Asphalts, oils, and emulsions shall meet all requirements per TxDOT “Standard Specification for Construction” Item 300. Prime Coat will be 0.20 Gal/SY and let heal for 24 hours. Resurface the road with 2 inches of Hot Mix Asphalt Concrete Type D.