Specifications include, but are not limited to: Contractor will perform power washing services at the System Building (UTS) and furnish all labor, materials and equipment necessary to do so. This will include (but will not be limited to) Contractor’s performance of power washing services at the parking garage and sidewalks at the System Building as set forth below: UTS Building Parking Garage (floors 3-10; 29,169 sq. ft. each floor); UTS Building Loading Dock (2,230 sq. ft.); UTS Building Basement Parking (25,752 sq. ft.); UTS Building Sidewalks on the south, east and west sides of UTS Building. These areas should be cleaned 100% free of all dirt, gum, oil, tar, and residue to present a high quality appearance. Contractor to field verify the sq. ft. for these areas.