Specifications include, but are not limited to: Furnish all labor, materials, tools, and equipment to repair, mill, and resurface the entire Parking Lot 26. The base bid will include the cost to mill the existing asphalt and provide cement stabilization to a depth of 8” using 40 pounds of Portland Cement per square yard. The subgrade shall be compacted in place at 95 to 100 percent of Standard Proctor. Install 3” of Asphalt Surface matching existing grades. Restriping per plans to be included in the base bid. Alternate Bid items if funding is available, University reserves the option to award or not award: 1) Add 1” of asphalt to provide 2” of asphalt base overlaid by 2” of asphalt surface. 2) Add 2” of asphalt to provide 3” of asphalt base overlaid by 2” of asphalt surface. 3) 2” irrigation sleeves as shown on plan. 4) Provide approximately 424 linear feet of new 4’ wide sidewalk along west curb line as shown on plan. 5) Provide wheel stops as shown on the plan. 6) Install tree islands with concrete borders with landscape quality soil for landscape areas as shown on plan. UTA will provide and install landscape plants. 7) Remove handicap sign and wheel stops and construct new standard ramp as shown.