Specifications include, but are not limited to: 1. Perform site investigations and geotechnical evaluations required to design all elements included in the project scope. 2. Since Wharves 7 and 1 may or may not be of similar design, the Consultant will prepare preliminary and final plans and specifications to Construct Wharf 7, with an optional 90% design of Wharf 1 for construction later, simultaneously. Perform procurement and construction phase services, including, but not limited to, analysis of proposals, preparation of addenda, contract negotiations, request for information and submittal review. 3. Design of Wharf 7 and optional Wharf 1, consisting of approximately 1000 linear feet per wharf. Provide possible design and construction documents scenarios for the following: (a) One contract document that includes a complete design package for Wharf 7 and (b) a 90% design for Wharf 1 to be designed simultaneously with the Wharf 7 design but will be constructed at a later date.4. Respondent must have experience in analysis and design of Marine Structures, including wharves with construction cost exceeding $5 million.5. Prepare 30, 60, 90% and final construction cost estimates. The Respondent team must be comprised of highly qualified professionals with cost estimation background and certified by AACEI of equivalent cost engineering organizations. Respondent to also have qualified professional(s) on the team to analyze and resolve constructability issues during the design phase.