Specifications include, but are not limited to: REPLACE COOLING TOWER. • REMOVE ABANDONED DX EQUIPMENT SERVING ORCHESTRA AND CHOIR ROOMS (A/C-3, A/C-4). NEW RTU FOR ORCHESTRA ROOM (RTU-8) AND TECHNOLOGY CLASSROOM (RTU-5) FOR AFTER HOURS TEMPERATURE CONTROL. • REPLACE 300 WING MULTIZONE AHU (FC-8). • REPLACE CAFETERIA AIR HANDLER (FC-9). • REPLACE BIG GYM AIR HANDLERS (FC-10, FC-11). • REPLACE SMALL GYM RTUS (RTU-1, RTU-2). • REPLACE LOCKER ROOM RTUS (RTU-3, RTU-4). • REPLACE DOMESTIC WATER HEATER EQUIPMENT. • REPLACE THE CENTRAL INVERTER/BATTERY POWERED LIGHTED EXIT SIGN SYSTEM INSTALLED IN 1996 WITH STANDARD 110V EXIT SIGNS. • REPLACE THE LOCKER ROOM LIGHTING WITH LED FIXTURES. • INTEGRATE AND INSTALL NEW BAS CONTROLS ON MECHANICAL SYSTEMS IN THE B-SECTION OF THE CAMPUS INTO A NEW TRIDIUM FRONT END.