The successful bidder will be required to supply all labor, materials and equipment to perform the Burlington Street Reconstruction Project as outlined within the contract drawings, specifications, and bidding documents and as directed by the City Engineer including, but not limited to the following: 1. Excavation of infrastructure trenches within and along the City street, necessary to facilitate full street reconstruction. 2. Installation of watermains, services, hydrants, tapping and connections to adjacent mains, testing and disinfection of watermain and services, and reconnection of services. 3. Installation of sanitary sewer manholes, mains, connections to adjacent mains, laterals, and reconnection to house laterals. 4. Installation of storm sewer structures, mains, and connections to adjacent mains. 5. Cutting, capping and abandonment of existing piping. 6. Full reconstruction of asphalt streets, driveways, concrete curbs, sidewalks, and miscellaneous infrastructure. 7. Provide traffic control and daily maintenance of project area and crossing streets. 8. Coordinate with City and the local utility companies regarding water, sanitary sewer, storm sewer, gas, electric, and communication utilities within the project area. 9. Replace topsoil, plant trees and restore lawn areas. 10. This construction project is funded in part with entitled money from the U.S. Department of Housing and Urban Development (HUD), Community Development Block Grant (CDGB) Program, American Rescue Plan, Consolidated Local Street and Highway Improvement Program (CHIPS) and local funding. The contractor shall pay their employees the higher wage rates from either the NYSDOL Prevailing Wage Rates or the Federal Davis Bacon Applicable Wage Rates. The NYSDOL Prevailing Wage Rates and the Federal Davis Bacon Applicable Wage Rates are attached. The NYSDOL Prevailing Wage Rates can be viewed on the NYSDOL website. The NYSDOL PRC# is 2023014501.