Specifications include, but are not limited to: Phase 1 The first project will consist of providing engineering design services to develop a detailed cost estimate to repair each station. A second detailed cost estimate is required to repair the station with provisions to bring the station to current standards (if required) and to elevate the control center. These estimates will include a plan to group the repair projects according to FEMA guidelines and recommendations. Phase 2 The second phase will consist of providing engineering design services, plans, specifications, bidding phase services, and construction contract administration to repair or, if required, construct a new sanitary sewer lift station to restore the sites’ pumping capacity.