Specifications include, but are not limited to: Las Colinas Blvd. Utility & Paving Reconstruction Phase 3 - South Retail to Lake Carolyn Parkway 22,983 square yards of concrete flatwork removal; 18,474 square yards of 10.50-inc thick 4,000 psi double mat (two layers #5 rebar OCEW top and bottom) reinforced concrete pavement; 1,264 square yard 8-inch thick 4,000 psi reinforced concrete pavement and driveway; 3.969 square yards of 5-inch reinforced concrete sidewalk; 1,452 linear feet of 18-inch through 30-inch RCP storm sewer main; 634 linear feet of 8-inch wastewater main; and 2,554 linear feet of 6-inch through 16-inch water main together will all associated appurtenances to complete this phase of the project in the City of Irving, Texas.