Specifications include, but are not limited to: This RFP may result in the award of a lease of 9,387 sq. ft. of office space in McKinney, Texas. 1. WALLS (a) All new interior walls to be taped, bedded, textured and painted. Existing walls to be repainted or cleaned to a like new condition. Color to be selected by occupying agency. (b) Provide ceramic tiles in Restrooms and Shower Room if applicable. (c) New demising walls shall be full height to structural deck with insulation and fire caulking at all penetrations. 2. FLOORS (a) Provide new anti-static VCT, locations to be determined by Lessee. (b) Provide new building standard commercial grade carpet throughout, subject to Lessee approval unless noted otherwise, color to be approved by Lessee. (c) Provide new 4” rubber cover base throughout, color to be selected by Lessee. 3. CEILING Ceiling grid to be minimum 9’-0” Above Finished Floor (A.F.F.) with new matching 2’ x 4’ or 2’ x 2’ ceiling tiles. 4. DOORS & HARDWARE (a) Use building standard doors, frames, and lever hardware throughout. (b) Re-paint or re-finish exterior doors and touch-up to like new condition. (c) All entrance, exit and interior doors to meet ADA/TAS required code. 5. ELECTRICAL (a) Lessor shall provide 120 volt electrical duplex wall outlets as follows: Walls in excess of twenty feet in length will require one every ten feet. A minimum of one in each hallway; hallways in excess of 50 feet in length will require one every 25 feet. (b) Lessor shall provide ring and string for telecommunication and automation station wiring in walls, ceiling or power poles, as applicable. The Lessee anticipates the need for cable drops at every workstation, office and other areas per the room schedule as will be identified during the Construction Documentation preparation phase. (c) Lessee will connect the furniture to the power and data drops. (d) Lessee shall provide cable. Lessor shall provide all necessary raceway, conduit or pathways per code and pull strings as necessary, to accommodate all work stations, offices etc. per Room Schedule.