Specifications include, but are not limited to: • Construction site must be secured at all times with minimum 6-foot-high, 180-foot X 90-foot metal temporary construction fence. Bid must include temporary construction fence costs. • Furnish all labor and materials for repairs to the Skate Park. • Steel Coping -Remove and replace Steel Coping with Cast in Place Concrete Coping. • Undermined Decks - Use shotcrete to fill deck locations that have been undermined. • Saw cuts and Seams – Approximately 400 linear feet throughout the park. Clean-out, repair, fill with flexible sealant. • Back of Cradle – Repair gouges as needed. Patch and fill holes. • Pool Coping Repair – Fix seams and replace blocks as necessary. • Concrete Cracks and Voids – Approximately 900 linear feet. Cracks to be routed out and filled with a flexible joint sealant. • Reseal Concrete – Approximately 9,500 sq. ft. Pressure wash, remove graffiti, reseal entire skate park with high-end penetrating concrete sealer. • Removal of post construction materials and general clean-up of site. • All construction/workmanship, engineering and design to meet or exceed industry standards for commercial grade usage. • Compliance with all Local, State and Federal permitting requirements. • Compliance with all Local, State and Federal Laws. • Contractor is responsible for obtaining all required permits. • Provide anticipated construction time-line for completion of project.