Specifications include, but are not limited to: 1. Furnish all materials, equipment, tools, labor, facility and incidentals, unless otherwise specified, including the proper legal disposal of all hazardous and non-hazardous waste materials necessary to perform and complete the work as further specified. The work will include the repair and refurbishment of all types of Port Houston hydraulic cylinders, valves and other hydraulic components. The Contractor shall warranty all Work, including parts and labor for a minimum of 90 days. 2. Equipment to be worked on shall be picked up from and delivered back to the requested Port Houston onsite location (Barbour’s cut, Bayport and Turning Basin Terminal) by the Contractor. The Department and Contractor may mutually agree to pick up and delivery from other locations. 3. Scheduling of work and timeframe of completion of work to be pre-set and determined and agreed upon by Port Houston Authority and the Contractor before each work request is started.