Specifications include, but are not limited to: 1. Install erosion and sedimentation control devices as shown on drawings. 2. Removal of spoil pile to facilitate use of Contractor work and staging area. 3. Installation of segment 1 and 2 sheet piles extending to the east. 4. Demolish, remove and dispose of the abandoned TX-35 bridge abutment. 5. If included in construction contract, remove and dispose of concrete debris located north of the abandoned TX-35 bridge abutment. 6. Clear and grub the site. 7. Install riprap as shown on construction contract drawings and included in construction contract. 8. If included in construction contract, install segment 3 and 4 of sheet piles. 9. Perform finish grading of site as shown on construction plan. 10. Install fence.