Specifications include, but are not limited to: Remove Furniture, Old Flooring, and Baseboards: 4.1.1. Prior to removal of the existing floor, Contractor shall remove all furniture and appliances (desks, filing cabinets, shelving, refrigerator, oven, etc.) and move them into a garage that is attached to the building. 4.1.2. Furniture shall be stored in the connecting garage during the floor replacement project. 4.1.3. Contractor shall remove old floor covering, which consists of a single layer of self-stick vinyl tile, and baseboards to expose concrete underneath. 4.1.4. Contractor shall prep floor with diamond grinders, repair minor floor cracks with an epoxy filler and level (as necessary) in preparation of installing new flooring.