Specifications include, but are not limited to: Fire Station No. 9: New one story fire station with mechanical mezzanine. Project includes dorms, kitchen, showers, day room, offices, IBC 2015 safe room, 2 1/2 Apparatus Bays with plymovent exhaust system, and workout room. PVC and standing seam metal roof systems. Brick, limestone, and metal wall panel exterior finishes. Public Safety Training Center: Two (2) new structures and associated site training elements. Building one: One-story pavilion with storage, break room, equipment rooms, toilet rooms, outdoor classroom and an indoor classroom. Structure comprised of CMU exterior with single sloping PVC roof system. Building two: Four-Story fire training structure with multiple interior rooms, live fire training props, Class “A” burn room, prop equipment rooms, repelling deck and stairways to roof elements. Structure comprised of exposed interior and exterior CMU walls with sloping concrete floor and roof decks. Site training consists of Vehicle Extrication area, Trench Rescue prop, Confined Space prop, open driving pad all set in a cityscape layout with concrete roadways.