Specifications include, but are not limited to: Boiler Removal - High School, Bardwell, large boiler room G109. Disassemble existing boiler and piping, remove storage tanks. Remove debris and clean up job site. Install a size determined by the client of a reduced but rating due to less use than originally expected. Stub out piping and values in case another holding tank is ever needed in the future. Existing boiler is over 1 million btu’s. Replacement boiler is 600,000 btu’s. Existing Teledyne lars, Boiler mn nq-1666-c-n-06-b, SN 7991461. Boiler Installation - Install new boiler and flue Install piping between tank and boiler and install new factory circulating pump and electrical wiring. Install new insulation on connecting piping. Install necessary hangers. Replace all existing gate valves with ball valves (10 valves). Pipe gas regulator to meet code (move outside)...