Specifications include, but are not limited to: C.1 Bachelor Creek Project Description This project includes replacing and upsizing approximately 4,800 LF of existing 15 inch sanitary sewer main with approximately 30 inch pipe. The project limits are generally along Highway 205 north of Highway 80 (W. Moore Avenue) from behind Cornerstone Baptist Church to Colquitt Road. Highway 205 ROW will be widened in the future due to the TxDOT improvements, so realignment of the existing sanitary sewer main will be required. See Exhibit A for an overview. C.2 June/Harrisse Water Main Project Description There is an existing 14 inch water main located in N. Frances Street, June Street and Harrisse Street in which several major leaks have occurred. The plan is to relocate this main out of residential streets and design approximately 1,950 LF of 16 inch main along N. Frances (old Highway 34) and in Rose Street and approximately 1,400 LF of 6 inch or 8 inch water main in June and Harrisse Streets to serve residents. See Exhibit B for an overview.