Specifications include, but are not limited to: 1. Assist with the development of grant applications, as necessary. 2. Provide all project information necessary to ensure timely execution of the environmental review. 3. Provide preliminary engineering, investigations, and drawings enough to achieve the preliminary design milestone, including at a minimum: 4. Cross sections/elevations with respect to: a. Project layout/staging areas b. General notes c. Special notes d. Design details e. Specifications f. Utility relocation designs g. Construction limits, including environmentally sensitive areas that should be avoided during construction h. Required permits i. Quantities j. Estimate of construction costs to within +/- 25% k. Schedules for design, permitting, acquisition and construction l. Design surveying, topographic and utility mapping.