Specifications include, but are not limited to: The Contractor shall have a facility equipped with all tools, equipment, space and supplies necessary to provide rental services for the term of the contract. In order to provide timely delivery said facility should be located within fifty miles (50) miles of the Dallas City Hall, 1500 Marilla, Dallas, TX 75201. The Contractor shall have immediate access to appropriate size pump units sufficient enough to fulfill orders within the timeframe stipulated in these specifications. All dewatering services will be ordered on an as-needed basis. The Contractor shall deliver all commercial pumping units at the agreed upon time and location in good working condition, completely serviced, with full fuel tank(s) and ready for operation. During the use of the pumping unit, any maintenance, including necessary fluids shall be the responsibility of the Contractor. For some sites the contractor will be required to have personnel for the duration of the dewatering. For other sites it will not be required but they must check back periodically to check the equipment’s operation status. Contractor shall install all necessary pipes/hoses and equipment and monitor operations. Contractor shall be responsible for traffic control. Contractor shall be responsible for obtaining all permits related to the cost of traffic control devices, flags, barricade setup and removal. The Contractor shall have all permits and/or license for dewatering and discharging of water required from local, state and federal authorities at the time the proposal is submitted. The Contractor is responsible for and shall include all charges incurred, whether foreseen or unforeseen, for these permits, licenses and inspections were applicable.